Patent application P.408449 for the basic solution.
4. / DEVELOPMENT & TEAM
Over 12 years of development.
Towards the first deployment.
Two companies have been selected for initial deployments.The next stage involves integration, construction of a demonstrator and measurements of the complete system.
CO₂ process research at Wrocław University of Science and Technology.
CFD analysis of earlier turbine concepts.
Preparing integration and the first installation.

Paweł Licznerski
Technology creator and owner · technical lead
Author of the TERYD concept. He is responsible for the thermodynamic architecture, calculations, intellectual property, system development, integration and preparation of the technology for deployment.
A graduate of the Faculty of Architecture at Wrocław University of Science and Technology, he worked as a research assistant in photogrammetry at the Faculty of Fine Arts of Nicolaus Copernicus University in Toruń. In the 1990s, he coordinated, among other projects, work on the study of conditions and directions of spatial development for Bydgoszcz. He subsequently ran his own design practice for many years, specialising in industrial and public buildings. For 21 years, he has worked on the development and implementation of solutions in clean energy, environmental protection and building structures with energy-related functions. His experience includes earlier projects involving completed water and air turbines, thermodynamic rotating machinery, passive magnetic bearings, generators and energy storage systems.

Paweł Dąbkowski
Project management · deployment coordination
He coordinates suppliers of the three main systems and the transition from R&D to the first industrial installation. He also manages investor communication during the campaign.
He graduated from the Faculty of Power and Aeronautical Engineering at Warsaw University of Technology and studied foreign trade at SGPiS. He has over 40 years of experience in Polish aviation, R&D, airline management, aircraft certification and maintenance organisations.
In energy and refining, he worked with Mitsui, Kawasaki Gas Turbine and JGC.
13 project questions and answers +
1. What is the current TRL and which tests support it?
We assess selected CO₂ compression and expansion processes tested at Wrocław University of Science and Technology in 2017 as TRL 6. Other solutions and the integrated system remain at TRL 4. CFD analyses and over two years of rotor-model optimisation have also been carried out.
Building the demonstrator, integrating the complete installation and measuring its performance are the next project stage; a visit to an operating installation is not yet available.
No continuous test of the complete installation has been performed yet. The objective is at least 300 hours, followed by an extended 1,200-hour test.
Such reviews do not replace actual system measurements, despite the process studies at Wrocław University of Science and Technology.
2. What is the net output after all auxiliary consumption?
The base model assumes —% overall net efficiency: a — kWth source yields — kWe after auxiliary consumption. Net output is calculated and requires measurement-based verification.
The base model assumes —% at 80°C.
The concept uses heat regeneration and return of heat to the process. The full balance must include external heat input, generator output, pumps, heat pumps and all auxiliary consumption. Regenerated heat is not counted again as new input energy.
3. What degradation is expected after 1,000 / 5,000 / 10,000 hours?
We do not yet have complete-system degradation data for those periods. Service life depends on the weakest component, which we currently consider to be the heat pumps. More than 20 years is assumed with proper operation and servicing, subject to confirmation for the selected equipment and duty cycle.
The design specifies equipment rated for 250 bar. The system operates inside a separate pressure boundary, without a dynamic shaft seal crossing that boundary.
4. Which heat sources qualify?
We consider all sources able to supply heat at 80°C or above. Qualification also depends on capacity, flow, operating hours, stability and heat transfer.
A water tank provides a buffer for a variable source. Its volume is sized for the variation profile and required safety reserve. It stabilises supply and stores thermal energy. It can also provide inexpensive energy storage for the plant using a simple hot-water tank.
5. What is the target installation CAPEX per kWe?
The base model allocates PLN — to equipment and integration for — kWe, approximately PLN —/kWe. The TERYD upfront fee is PLN —/kWe, or PLN — in total. These are model figures; final costs require a site-specific estimate.
The base installation model assumes approximately PLN — including equipment and upfront fees. The actual first-deployment budget also requires a scope for R&D, integration, commissioning, site works and contingency; it must be agreed for the selected site.
6. What are OPEX and service costs per MWh?
The assumption is PLN —/year, or —% of equipment CAPEX and PLN —/MWh at — MWh/year. Routine service: —% — PLN —/MWh; overhaul reserve: —% — PLN —/MWh; insurance and administration: —% — PLN —/MWh. Royalties are calculated separately. Contractor and service quotations are required.
7. What are the scenarios at PLN — / — / — / — per MWh?
At PLN —/MWh the model gives a simple installation payback of approximately — years. This is not TERYD’s company-level break-even.
Assumptions, taxes and benefit sharing follow S6. The scenarios change only the energy price to 60%, 100%, 140% and 200% of the S6 value.
| Item | — PLN/MWh | — PLN/MWh | — PLN/MWh | — PLN/MWh |
|---|---|---|---|---|
| Revenue / energy value [PLN/year] | — | — | — | — |
| Royalties [PLN/year] | — | — | — | — |
| Cash flow after OPEX and royalties [PLN/year] | — | — | — | — |
| Plant cash flow [PLN/year] | — | — | — | — |
| Investor cash flow [PLN/year] | — | — | — | — |
| Simple payback of the installation [years] | — | — | — | — |
8. What is the current patent status?
The basic solution was filed on 6 June 2014 as P.408449. Patent protection is no longer being maintained. We rely on the published disclosure and confidential know-how. New solutions concern operation, heat exchangers, turbine-generator assemblies and rotor blades.
Rights to earlier R&D and the core technology are held by Paweł Licznerski. Investment in a project SPV does not transfer ownership of the core technology.
9. Has an FTO review been completed?
We are not currently presenting a formal freedom-to-operate report. A formal review requires a defined solution and target markets.
10. Which LOIs, pilot or commercial contracts are signed?
Two specific companies have been selected for initial deployments. Negotiation status, sites and financing will be discussed in project meetings.
11. How are royalties calculated?
The base model sets royalties at —% of net electricity value: net MWh × agreed settlement price × —%. At — MWh and PLN —/MWh this is PLN —/year. No generation means no energy-based royalty. The plant premium adds — percentage points of cash flow for heat, site and infrastructure; terms are set in a separate agreement.
12. Does TERYD offer technology, licences, services or SPV equity?
We offer licences for defined uses, engineering and deployment services, and participation in individual SPVs. We do not offer ownership rights in the master licence. SPV equity, cash-flow entitlement and licensing scope are separate contractual elements.
There is no universal percentage. Equity is agreed for a defined SPV based on valuation, budget and the other parties’ contributions.
13. What is the cost of acquiring one customer?
Cost depends on management cooperation, data availability and technical negotiations. If expectations are not matched by cooperation, we prefer another customer. No fixed CAC is declared; it will be measured from actual costs and successful deployments.