TERYDPOLISH TECHNOLOGY
3. COOPERATION MODEL

3. / PARTNERSHIP MODEL

Plant, Investor and Technology.

The plant does not have to finance the entire installation.Its resources are combined with investor capital in a separate project company.

Industrial plantHeat, site, infrastructure and an agreed share of CAPEX.
→
Installation in an SPVA joint project with a defined budget and cash-flow allocation.
←
Investor and TERYDProject capital, licence, engineering and system integration.

1. / FOR THE PLANT

Shared financing.

The contribution is agreed for each project. The model allocates the plant an additional 5.0 percentage points of the cash-flow share in return for providing heat, a site and infrastructure.

2. / FOR THE INVESTOR

A specific project.

Financing relates to a specific installation. Equity participation and distribution arrangements are defined in a separate agreement.

3. / FOR TERYD

Revenue from deployment.

Licensing, technology services and royalties. The rights to the core technology remain with its owner.

   →   Investment payback calculator for German rates (Berlin)
   →   Investment payback calculator → PL rates + white certificates

History of energy prices and four additional charges in Poland+
1. TGE day-ahead price with and without the four charges
Year TGE RDN
[GBP/MWh]
Selected charges
[GBP/MWh]
Total
[GBP/MWh]
2016 31.32 2.72 34.04
2017 30.59 3.15 33.75
2018 43.52 2.41 45.93
2019 44.47 2.66 47.13
2020 40.69 2.83 43.52
2021 77.69 17.16 94.85
2022 154.19 22.65 176.84
2023 103.34 25.44 128.79
2024 82.30 31.76 114.05
2025 86.43 34.78 121.21
TGE day-ahead price with and without the four charges [GBP/MWh]
The chart compares the annual average day-ahead electricity price (TGE RDN) with that price plus four regulated charges. For 2016, it uses half the renewables charge, which applied from 1 July. The industrial capacity charge has applied since 2021 and is levied on consumption during specified hours. The total is for comparison across years.
2. History of the four charges (2016–2025) [GBP/MWh]
Year Capacity charge Quality charge Renewables charge Cogeneration charge
2016 0.00 2.48 0.24 0.00
2017 0.00 2.44 0.72 0.00
2018 0.00 2.41 0.00 0.00
2019 0.00 2.66 0.00 0.00
2020 0.00 2.56 0.00 0.27
2021 14.76 1.97 0.43 0.00
2022 19.87 1.82 0.17 0.79
2023 19.83 4.65 0.00 0.96
2024 24.54 6.02 0.00 1.20
2025 27.35 6.17 0.68 0.58
History of the four charges [GBP/MWh]
Values are shown in GBP/MWh. The capacity charge was converted from PLN/kWh to GBP/MWh. Years before each charge was introduced are shown as zero. The figures exclude variable network tariffs, fixed distribution fees, supplier margins, balancing costs, excise duty and VAT. The quality charge is based on URE and PSE tariffs. Fixed conversion rate: 1 GBP = 5.1635 PLN.