5. Investment payback calculator for German rates (Berlin)
Update

→—→155.78Energy price[Trading Economics]—→—Capacity charge[Stromnetz Berlin]—→—National levies[Stromnetz Berlin]
Trading Economics ↗Stromnetz Berlin ↗BDEW ↗

Total electricity purchase cost for the plant [EUR/MWh]

Updates cover energy, capacity charges and national levies. Other items are manual. Total purchase costs are not necessarily avoided through self-consumption.

Total purchase cost: 250.28 EUR/MWh

Energy price used in the table — sum of all costs:     250.28 EUR/MWh

TERYD – SPV installation financing model
1.     INPUT DATA
Parameter Value Unit Description Type Notes
Heat source thermal capacity kWth Available waste heat capacity supplied to the TERYD system. EDITABLE Plant data
TERYD electrical efficiency 40 % Conservative assumed net electrical efficiency of the TERYD system. FIXED Technology assumption
Operating hours h/year Effective operating hours per year. EDITABLE Plant operating profile
Energy price / value EUR /MWh Electricity selling price or the plant’s avoided purchase cost. EDITABLE Market assumption
TERYD equipment price per kWe 2,550 EUR/kWe Unit cost used to calculate equipment CAPEX. FIXED Base rate:
2,550 EUR/kWe
TERYD equipment CAPEX 1,530,110 EUR Net electrical capacity × equipment price per kWe, excluding the upfront fee. FORMULA Calculated automatically
TERYD upfront rate 109.62 EUR /kWe One-time licence fee based on net electrical capacity. FIXED Fee based
on capacity
TERYD royalties 21 %
of revenue
TERYD fee based on annual electricity revenue. FIXED Annual fee
Analysis horizon years Period used to calculate IRR and payback for the plant and investor. EDITABLE Base model
Plant premium for heat / site %
DCF
Additional share for the plant in return for heat, site and infrastructure. EDITABLE Negotiable assumption
2.     INSTALLATION OUTPUTS
Parameter Value Unit Calculation method Type Notes
Net electrical capacity 600 kWe Thermal capacity × TERYD efficiency FORMULA
Electricity generation 4,320 MWh /year Electrical capacity × operating hours / 1,000 FORMULA
Energy revenue 1,081,210 EUR /year Electricity generation × energy price FORMULA
TERYD upfront fee 65,770 EUR Net electrical capacity × upfront rate FORMULA
Total project investment 1,595,880 EUR CAPEX + TERYD upfront fee FORMULA
3.     SPV OPEX – TOTAL OPERATING COST
Item % CAPEX EUR/year Scope Type Notes
1. Routine maintenance 34,427 Scheduled service, consumables, routine inspections and technical support. EDITABLE Recurring annual SPV cost.
2. Major maintenance reserve 26,777 Reserve for major overhauls, costly periodic repairs and component replacements. EDITABLE SPV financial reserve.
3. Insurance
/ administration
11,476 Insurance for the installation and the SPV, inspections, administration and organisational support. EDITABLE Administrative costs
and project insurance.
TOTAL OPEX 4.75 72,680 Total SPV operating costs (1+2+3) FORMULA
4.     ANNUAL PROJECT CASH FLOW
Item Value Unit Description Order Notes
Energy revenue 1,081,210 EUR/year Annual value of the electricity generated by the installation. 1
SPV OPEX 72,680 EUR/year Total SPV operating cost. 2 Cost before DCF distribution
TERYD royalties 227,054 EUR/year TERYD royalty calculated on energy revenue. 3 Cost before DCF distribution
Distributable cash flow (DCF) 781,475 EUR/year Cash remaining after OPEX and royalties, distributed between the plant and investor. 4 Distribution basis

Financing and payback — four scenarios

5.     FINANCING OPTIONS
Plant contribution[%] Plant contribution[EUR] Investor contribution[EUR] Plant / Investor[%] Plant cash flow[EUR/year] Investor cash flow[EUR/year] IRRPlant[%] (10 years) IRRInvestor[%] (10 years) Plant payback[years] Investor payback[years] Scenario
0 0.00 1,595,880 5.0 / 95.0 39,074 742,402 n/a 45.4 — 2.15 No CAPEX contribution from the plant; remuneration solely for providing waste heat, a site and infrastructure.
5 79,794 1,516,086 10.0 / 90.0 78,148 703,328 97.8 45.3 1.02 2.16 Low plant contribution; the investor finances most of the project.
10 159,588 1,436,292 15.0 / 85.0 117,221 664,254 73.1 45.1 1.36 2.16 ↓
15 239,382 1,356,498 20.0 / 80.0 156,295 625,180 64.9 45.0 1.53 2.17 Balanced scenario: the plant contributes capital while the investor retains an attractive IRR.
20 319,176 1,276,704 25.0 / 75.0 195,369 586,107 60.7 44.8 1.63 2.18 ↓
25 398,970 1,196,910 30.0 / 70.0 234,443 547,033 58.2 44.6 1.70 2.19 ↓
30 478,764 1,117,116 35.0 / 65.0 273,516 507,959 56.5 44.3 1.75 2.20 ↓
35 558,558 1,037,322 40.0 / 60.0 312,590 468,885 55.3 44.0 1.79 2.21 Higher plant contribution; less external capital is required and the investor receives a lower share of cash flow.
40 638,352 957,528 45.0 / 55.0 351,664 429,811 54.4 43.7 1.82 2.23 ↓
45 718,146 877,734 50.0 / 50.0 390,738 390,738 53.7 43.3 1.84 2.25 ↓
50 797,940 797,940 55.0 / 45.0 429,811 351,664 53.1 42.8 1.86 2.27 ↓
55 877,734 718,146 60.0 / 40.0 468,885 312,590 52.6 42.2 1.87 2.30 The plant finances most of the project; the investor provides supplementary funding.
60 957,528 638,352 65.0 / 35.0 507,959 273,516 52.3 41.5 1.89 2.33 ↓
65 1,037,322 558,558 70.0 / 30.0 547,033 234,443 51.9 40.6 1.90 2.38 ↓
70 1,117,116 478,764 75.0 / 25.0 586,107 195,369 51.7 39.3 1.91 2.45 ↓
75 1,196,910 398,970 80.0 / 20.0 625,180 156,295 51.4 37.6 1.91 2.55 ↓
100 1,595,880 0.00 100.0 / 0.0 781,475 0.00 48.0 n/a 2.04 — The Plant funds the entire project and receives 100% of distributable cash flow. No Investor participation.